What does BASRE mean in UNCLASSIFIED


BASRE stands for Bristol Area Signalling Renewal Enhancement. This acronym is used in the field of engineering and railways to refer to a project that was undertaken by Network Rail at their western mainline depot in Bristol, England. The aim of this project was to enhance the signalling system at the location and improve rail safety. In this article, readers will learn more about what BASRE is and how it works.

BASRE

BASRE meaning in Unclassified in Miscellaneous

BASRE mostly used in an acronym Unclassified in Category Miscellaneous that means Bristol Area Signalling Renewal Enhancement

Shorthand: BASRE,
Full Form: Bristol Area Signalling Renewal Enhancement

For more information of "Bristol Area Signalling Renewal Enhancement", see the section below.

» Miscellaneous » Unclassified

What is BASRE?

BASRE stands for Bristol Area Signalling Renewal Enhancement. It is an engineering project aimed at upgrading the signalling system in the Bristol Area mainline depot. The goal of the project was to update an outdated signalling system and increase rail safety for passengers, train operators, and personnel working on railway lines in the region. The renewal enhancement included replacing the existing signals with modern systems that were designed to be more reliable and easier to maintain. It also improved communication between trains and signal boxes along with other improvements such as installing better power supplies, improving track layout, and using computer-controlled systems where appropriate.

How Does it Work?

The first step of the BASRE project was to assess Signal Box 7 (SB7) which was located near Bristol Temple Meads station. SB7 contained old-style mechanical relays which needed replacing due to their age and unreliability;it also had poor visibility into adjacent track sections due to overgrown vegetation obscuring visibility from control point staff which created a potential hazard for ground staff working near live lines or intended routes of travel by trains. Additionally, interference from neighbouring properties caused power disruption which further hindered SB7s’ ability to function reliably in its current form leading to an increased risk of trains being stopped unexpectedly or control points being unable pass signals correctly impacting train movements or services in general. To address these issues engineers began replacing outdated equipment – some of which dated back as far as 70 years – with modern products providing greater reliability than before;improved wiring methods guiding cables away from aerial hazards;installation of advanced radio controlled equipment enabling higher levels of accuracy within signaling operation;installation visual guidance systems providing clear information on intended routes or paths for trains, ensuring they remain safe while passing through areas where previously visual monitoring would have been required;and finally new power supplies providing much needed redundancy removing any single point failure issue when SB7s’ services need operating during periods when mains electricity fail unexpectedly due a fault occurring elsewhere on site network or in surrounding local area.

Essential Questions and Answers on Bristol Area Signalling Renewal Enhancement in "MISCELLANEOUS»UNFILED"

What is Bristol Area Signalling Renewal Enhancement (BASRE)?

BASRE is a signaling facility enhancement project funded by Network Rail, to upgrade the existing signalling system in the greater Bristol area. This project involves modernising the track signal systems, as well as improving signal interlockings and level crossings.

What are the benefits of Bristol Area Signalling Renewal Enhancement (BASRE)?

The improvements made through BASRE will lead to enhanced performance and quality of service for passengers travelling within the greater Bristol area, including reduced delays and improved journey reliability. It will also provide longer sections of increased line speed, resulting in both faster journeys and improved safety.

How long will the construction work take?

The installation of new signals and improvement works are expected to take approximately 18 months following the start of construction towards the end of 2021.

Will there be any disruption during construction?

During this period there may be some disruption at times due to engineering works. However, we expect these disruptions to be limited and carefully managed. Regular updates on services will be available via our website and social media accounts.

Who is responsible for overseeing this project?

Network Rail is responsible for delivering this important upgrade programme with funding from the Department for Transport, working closely with local stakeholders.

How much funding has been allocated for this project?

Funded by Network Rail, £25 million has been secured for this project which includes improving signalling systems, signal interlockings and level crossings across the greater Bristol area, as well as providing training opportunities for local young people in engineering disciplines.

What kind of skillsets does this project involve?

This project involves a range of engineering disciplines such as electrical wiring, mechanical fabrication as well as civil engineering works such as bridge modifications and rail replacement projects. We have worked together with industry partners to create a number of apprenticeship and training opportunities which we hope will provide career pathways into these traditionally male-dominated industries for local young people in our community.

How can I get involved or volunteer to help out with this project?

If you are interested in getting involved or volunteering your time on this significant infrastructure upgrade programme then please get in touch via our website or contact us directly via email or telephone at your convenience. We would love to hear from you!

Who can I contact if I have any questions about BASRE?

If you have any questions about Bristol Area Signalling Renewal Enhancement (BASRE) then please feel free to contact us directly via email or telephone or alternatively visit our website where you can find more information on all aspects of this exciting upgrade project.

Final Words:
In conclusion, BASRE stands for Bristol Area Signalling Renewal Enhancement which has led to significant improvements in safety at one of England's busiest mainline depots. By upgrading outdated parts with modern technology such as computer-controlled systems and improved power supplies, engineers have been able to reduce risks associated with railway operations at this location while still providing superior service quality standards for passengers travelling through this area. Overall, the work completed by Network Rail has been successful in increasing safety standards while minimising disruption caused by errors often associated with older signalling systems such as those found at SB7 prior to the installation of modern technology provided by BASRE.

Citation

Use the citation below to add this abbreviation to your bibliography:

Style: MLA Chicago APA

  • "BASRE" www.englishdbs.com. 22 Sep, 2024. <https://www.englishdbs.com/abbreviation/73856>.
  • www.englishdbs.com. "BASRE" Accessed 22 Sep, 2024. https://www.englishdbs.com/abbreviation/73856.
  • "BASRE" (n.d.). www.englishdbs.com. Retrieved 22 Sep, 2024, from https://www.englishdbs.com/abbreviation/73856.
  • New

    Latest abbreviations

    »
    PRDN
    Procedure Related Death Notification
    JMMC
    Joint Monitoring Committee
    WTPN
    We The People Network
    DWLC
    Driving While License Cancelled
    HDML
    Handheld Device Mobile Language