What does DBB mean in COMPUTING


DBB stands for Design-Bid-Build, which is a traditional approach to constructing buildings or other projects. In this process, an owner begins by hiring an independent architect or designer to develop detailed plans and specifications that are then used as part of bidding documents distributed among licensed contractors. Each contractor submits a bid based on their understanding and interpretation of the project’s goals and requirements outlined in these documents. The winning bid is chosen after careful evaluation by the owner who then enters into a contract with that contractor to carry out work according to agreed terms.

DBB

DBB meaning in Computing in Computing

DBB mostly used in an acronym Computing in Category Computing that means Design- Bid-Build

Shorthand: DBB,
Full Form: Design- Bid-Build

For more information of "Design- Bid-Build", see the section below.

» Computing » Computing

What does DBB stand for?

Advantages

One of the main advantages of using DBB is its predictability in both cost and timeline since it allows owners to compare bids from multiple contractors before selecting one for work. It also permits them to be actively involved throughout every stage in order to ensure that objectives are met efficiently while managing potential risks associated with contracting separately with various entities over long periods of time. Best practices also include conducting periodic inspections prior to making payments at each stage so that matters can be resolved speedily between all parties involved if any problems arise.

Essential Questions and Answers on Design- Bid-Build in "COMPUTING»COMPUTING"

What is Design-Bid-Build?

Design-Bid-Build, also known as design/bid/build and design-bid/build, is a traditional method of project delivery in which an owner contracts with separate entities for the design and construction of a project. The architect or engineer designs the project and provides performance criteria to the contractor who then bids on the work and constructs it according to those specifications.

What are advantages of using Design-Bid-Build?

The main advantage of using the Design Bid Build approach is that the stepwise process allows for more control by the owner on both quality and cost. It also allows owners to establish clear lines of responsibility with each party involved in order to better manage costs through competitive bidding. Additionally, this method can limit potential conflicts between designers and contractors while providing transparency throughout the duration of the project.

What are disadvantages associated with Design-Bid-Build?

One major disadvantage associated with this procurement method is that it can be lengthy due to both detailed design requirements as well as prolonged bid times when searching for a qualified contractor. Additionally, there may be challenging ramifications regarding performance expectations upon completion since initial plans and goals may have changed during construction due to unforeseen circumstances or disagreements between parties early on in the process.

How long does it take for a Design/Bid/Build project?

This depends on various factors including complexity, size, scope, number of bidders, etc., however typically projects managed under this procurement system will require 12–18 months from concept review to completion..

Does Design/Bid/Build ensure safety standards & codes are followed?

Yes absolutely! Quality assurance oversight should begin as soon as possible in order for safety standards & codes to be met throughout all aspects of the project such as from site selection & planning through installation & testing services.

Is there flexibility among components utilized in a DBDB contract?

Yes there is flexibility among components utilized in a DBDB contract provided that certain industry standard protocols are adhered to such as metrology requirements for accurate measurements & high quality materials used within functional components.

What contractual considerations need addressed prior entering into agreement between Owner & Contractor?

Prior entering any agreement between Owner & Contractor contractual considerations should ensure fairness for both parties include outlining scope of work, timelines estimates breakdowns & performance standards wile addressing liabilities, dispute resolutions etc.

Final Words:
In conclusion, Design-Bid-Build (DBB) is a proven and well-established procedure used by many construction owners seeking reliable project delivery within specified budgetary guidelines. By involving separate independent entities throughout each stage from design through completion, an owner can effectively manage risk while ensuring quality control parameters are met consistently throughout each phase under contractual agreement obligations.

DBB also stands for:

All stands for DBB

Citation

Use the citation below to add this abbreviation to your bibliography:

Style: MLA Chicago APA

  • "DBB" www.englishdbs.com. 21 Nov, 2024. <https://www.englishdbs.com/abbreviation/202541>.
  • www.englishdbs.com. "DBB" Accessed 21 Nov, 2024. https://www.englishdbs.com/abbreviation/202541.
  • "DBB" (n.d.). www.englishdbs.com. Retrieved 21 Nov, 2024, from https://www.englishdbs.com/abbreviation/202541.
  • New

    Latest abbreviations

    »
    Q
    Qatari Emiri Corps of Engineers
    C
    Computer Voice Stress Analyzer
    F
    F*** My World
    M
    Massachusetts Association of Women in Law Enforcement
    R
    Research Integrity Office. Office responsible for research integrity - ensuring that research across an organisation/country is ethical.