What does BWMC mean in MANAGEMENT
The Ballast Water Management Convention (BWMC) is a 2004 treaty signed by the International Maritime Organization to protect the global marine environment from the potential spread of aquatic species in ships' ballast water. This convention helps to prevent invasive species from being transferred between ecosystems, thereby preserving biodiversity and promoting maritime safety.
BWMC meaning in Management in Business
BWMC mostly used in an acronym Management in Category Business that means Ballast Water Management Convention
Shorthand: BWMC,
Full Form: Ballast Water Management Convention
For more information of "Ballast Water Management Convention", see the section below.
» Business » Management
Essential Questions and Answers on Ballast Water Management Convention in "BUSINESS»MANAGEMENT"
What is the Ballast Water Management Convention?
The Ballast Water Management Convention (BWMC) is an international agreement entered into force in 2017 that requires ships to take measures to prevent, reduce, and control the transfer of aquatic organisms and pathogens through the ship's ballast water and sediments.
Why was the BWMC created?
The BWMC was established in order to protect important ecosystems around the world by preventing the spread of invasive aquatic species that can be transported in ships' ballast water.
How does a ship comply with this convention?
Ships must install appropriate ballast water management systems that are approved by their flag state before they may enter port. The systems used must meet both national and international requirements for discharge quality and volume as determined by sampling and analysis methods specified in the convention.
Who is responsible for setting standards for these systems?
Standards for on-board ballast water management systems are set by IMO-recognized organizations designated by each country's maritime administration or “flag state.†When these organizations approve a system for installation on a vessel, it should be implemented according to instructions from its manufacturer.
Is there a timeline for when ships must be compliant with this convention?
Yes. All vessels constructed after 8 September 2017 must comply within six months of going into service while all existing vessels must comply within five years of entering into force of this convention if they are above 400 gross tons or engage on international voyages.
Final Words:
The Ballast Water Management Convention (BWMC) seeks to protect global marine environments from damaging invasions of potentially dangerous aquatic species that can be transferred via ships' ballast water between different areas of sea life. Through proper installation of ballast water management systems approved by their respective flag states, all vessels at least 400 gross tonnage engaged on international voyages must comply with this regulation within five years after its entry into force date or six months after going into service (for vessels constructed after 8 September 2017).